The soil investigation report handed into the structural engineer for the design of pile foundation objective need to contain the embedment duration of your piles, the advised sizes from the pile, the safe Doing the job load of each and every pile sizing, and various facts Which may be essential https://arthurk555fyq7.wikifrontier.com/user